Installation
2-3
ET 200eco Distributed I/O Station
A5E00158716-02
Procedure
Using the screws, tighten the I/O module onto a level base. The I/O module must
be screwed onto the base at both fastening points (at the front panel top and
bottom). Tightening torque: 3 N/m.
30
200
5.5 x 7
5
210
60
Figure 2-1
Mounting the I/O module onto the base
2.3
Installation of the terminal block
Properties
The terminal block connects the ET 200eco to the power supply and to the
PROFIBUS DP network.
Requirements
The I/O module is installed.
Tools required
Medium size Phillips screwdriver
Summary of Contents for SIMATIC ET 200eco
Page 8: ...Preface viii ET 200eco Distributed I O Station A5E00158716 02 ...
Page 18: ...Product overview 1 6 ET 200eco Distributed I O Station A5E00158716 02 ...
Page 70: ...Commissioning and diagnostics 4 16 ET 200eco Distributed I O Station A5E00158716 02 ...
Page 116: ...I O address area C 6 ET 200eco Distributed I O Station A5E00158716 02 ...
Page 124: ...Index Index 4 ET 200eco Distributed I O Station A5E00158716 02 ...