Be sure that the front and back doors of the cabinet have porosities greater than 50% for good ventilation and heat
dissipation.
Installation Tools
Common Tools
Cross screwdriver, straight screwdriver, related electric and optical cables
Bolts, diagonal pliers, straps
Special Tools
Anti-static glove, stripping pliers, crimping pliers, crimping pliers for the crystal head,
wire cutter
Fiber Optic Cleaning Tools
Air-laid paper, optical fiber microscope
Meter
Multimeter, bit error rate tester (BERT), optical power meter
The tool kit is customer supplied.
Precaution for Fiber Connection
Before connecting fiber cables, make sure the model of the optical transceiver and fiber type match the optical port. The
transmit port on the local device should be connected to the receive port on the peer device and vice versa.
Unpacking Requirements
Goods Checklist
Chassis Carton
Device panels are installed and operational.
Fans, screwdriver, anti-static wrist strap, yellow/green grounding wires, quick installation guide,
packing list
Module Carton
Modules, packing list, documentation
A normal delivery should contain the above mentioned items, which may differ from the actual delivery,
depending on purchase contracts. Please check your goods carefully against the packing list or purchase
contract. If you have any questions or there are any errors, please contact your distributor.
Summary of Contents for RG-S8605E
Page 1: ...RG S8600E Series Switches Hardware Installation and Reference Guide V1 09...
Page 63: ...Figure 2 2 Preventing EMI on RG S8607E Figure 2 3 Preventing EMI on RG S8610E...
Page 86: ...Figure 3 21 Grounding Point on the Rear of the RG S8610E Switch...
Page 116: ...Figure 7 12 Replacing the Module for RG S8610E...
Page 120: ...Note A Fan modules to be removed B Fan modules to be installed...
Page 132: ......