
4-72
This is required when Take-up unit is installed or TU Junction Board is replaced.
This is to check whether Take-up Unit operates properly.
1
Confirm that the cable is connected to the connector
named [TAKE UP] and turn on the Main Power switch.
2
SERVICE MENU
[ ] , [ ] , [ ] + SUB POWER ON
[MENU] key
MENU
[TU] menu supports the connector named
[TAKE UP].
Although [OPTION-TU] menu is for another
connector with no name, it is not in use.
3
Select [TU] menu under [SUB MENU]>[TU CHECK].
SERVICE MENU
SUB MENU
SUB MENU
TU CHECK
[ ]
[ ]
[ ]
[ ]
TU CHECK
TU
TU
START START
[ ]
Undersurface of the right side of machine
4-17 TAKE-UP UNIT OPERATION CHECK (Referential Time : 2min.)
Turn on the Sub Power switch while pressing [ ],
[ ] and [ ] keys to enter the SERVICE MODE.