![Rohde & Schwarz EX-IQ-BOX User Manual Download Page 326](http://html1.mh-extra.com/html/rohde-and-schwarz/ex-iq-box/ex-iq-box_user-manual_1477982326.webp)
Remote Control Commands
R&S
®
EX-IQ-BOX
311
User Manual 1409.5570.32 ─ 05
Example:
SOUR1:EBOX:CPRI:HW:SMA:RXEG 10
sets the equalizer gain to 10 dB.
Manual operation:
See
[:SOURce<hw>]:EBOX:CPRI:HW:T14T
<time>
Sets the frame timing difference between the output signal at R1 and the input signal at
R4.
Depending on the CPRI test mode you can specify either T14 or TOffset. The other
parameter is calculated accordingly.
Parameters:
<time>
float
Example:
EBOX:CPRI:HW:T14T 180
sets T14=180 ns
Manual operation:
See
[:SOURce<hw>]:EBOX:CPRI:HW:TIMing?
The command queris, if the R21 timing calculation is invalid (CPRI requirement 21).
Return values:
<Timing>
0 | 1
*RST:
0
Example:
SOUR1:EBOX:CPRI:HW:TIM?
check if timing calculation is correct.
Response:
1 (0 = no error)
the R21 timing calculation is invalid.
Usage:
Query only
[:SOURce<hw>]:EBOX:CPRI:HW:TOFFset
<offset>
Sets the frame timing offset between the input signal at R2 and the output signal at R3.
Depending on the CPRI test mode you can specify either T14 or TOffset. The other
parameter is calculated accordingly.
Parameters:
<offset>
float
Example:
EBOX:CPRI:HW:TOFF 10
sets 10 ns timing offset
Manual operation:
See
CPRI Remote Control Commands
Summary of Contents for EX-IQ-BOX
Page 147: ...Protocol Settings R S EX IQ BOX 132 User Manual 1409 5570 32 05 CPRI...
Page 391: ......