
Chapter 3 - Setup and Installation
Stand-Alone Dual Port Dual Host Dual Connection Configuration
78
b
Connect another data cable from the “D2” connector on the lower Disk I/O
card installed in the primary RAID enclosure to the “D1” connector on the
upper Disk I/O card in the daisy-chain enclosure.
Stand-Alone Dual Port Dual Host Dual Connection Cabling Diagram (Daisy-Chain)
CAUTION:
When using dual loop topologies, you will be required to install and
use volume management software.
13
Repeat steps 8 through 11 for each additional daisy-chained enclosure.
14
Power on your system, refer to “Powering On the Storage System” on page 113.
This completes the setup and cabling of this configuration.
Summary of Contents for OmniStor 4900F Series
Page 1: ......
Page 2: ......
Page 4: ......
Page 38: ...Chapter 1 Getting Started Audible Alarm 24...
Page 58: ...Chapter 2 Topologies and Operating Modes Application of Availability 44...
Page 128: ...Chapter 3 Setup and Installation Powering Off the Storage System 114...
Page 156: ...Chapter 5 Troubleshooting Problems During Bootup 142...
Page 178: ...Chapter 6 Maintenance Replacing the Enclosure 164...
Page 182: ...Appendix A Technical Information Specifications 168...
Page 196: ...Index 182...