
Chapter 3 - Setup and Installation
Multi-Port Mirrored Dual Host-Quad Connection Configuration
97
6
Connect the Fibre Channel data cable(s).
a
Connect a cable from the first host (Node A) first HBA FC port to the “H0”
connector on the right Host I/O card.
b
Connect another cable from the first host (Node A) second HBA FC port to
the “H0” connector on the left Host I/O card.
c
Connect another cable from the second host (Node B) first HBA FC port to
the “H1” connector on the left Host I/O card.
d
Connect another cable from the second host (Node B) second HBA FC port
to the “H1” connector on the left Host I/O card.
Multi-Port Mirrored Dual Host-Quad Connection Cabling Diagram
7
(Embedded StorView only) Connect a CAT 5e ethernet cable from the RAID
Controller network port to your ethernet switch or LAN. Connect a second
CAT 5e ethernet cable from the second RAID Controller to another network
connection.
Summary of Contents for OmniStor 4900F Series
Page 1: ......
Page 2: ......
Page 4: ......
Page 38: ...Chapter 1 Getting Started Audible Alarm 24...
Page 58: ...Chapter 2 Topologies and Operating Modes Application of Availability 44...
Page 128: ...Chapter 3 Setup and Installation Powering Off the Storage System 114...
Page 156: ...Chapter 5 Troubleshooting Problems During Bootup 142...
Page 178: ...Chapter 6 Maintenance Replacing the Enclosure 164...
Page 182: ...Appendix A Technical Information Specifications 168...
Page 196: ...Index 182...