
Chapter 3 - Setup and Installation
Cabling the DC Power Supplies
54
4
Repeat the above steps for each additional storage system enclosure you will be
installing with AC power supplies.
This completes the physical hardware installation, refer to “Network Connectivity for
Embedded StorView” on page 55 and “Before You Continue...” on page 55.
Cabling the DC Power Supplies
NOTE:
Refer to “DC Power Supply Connector Pinout” on page 92 for wiring and
connector details.
If you are using the DC Power Supply system, refer to the following procedures to
properly connect the cables.
1
Plug the connector into the power supply, it is keyed to install only one way.
2
Connect the two Red pair wires to the DC Feed +48VDC connection.
3
Connect the two Green/Yellow pair wires to the DC Feed ground connection.
4
Connect the two Black pair wires to the DC Feed -48VDC connection.
Attaching the DC Cable
5
Repeat the above steps (1 - 4) for the second power supply, if this option was
ordered.
This completes the physical hardware installation, refer to “Network Connectivity for
Embedded StorView” on page 55 and “Before You Continue...” on page 55.
Summary of Contents for OmniStor 4900F Series
Page 1: ......
Page 2: ......
Page 4: ......
Page 38: ...Chapter 1 Getting Started Audible Alarm 24...
Page 58: ...Chapter 2 Topologies and Operating Modes Application of Availability 44...
Page 128: ...Chapter 3 Setup and Installation Powering Off the Storage System 114...
Page 156: ...Chapter 5 Troubleshooting Problems During Bootup 142...
Page 178: ...Chapter 6 Maintenance Replacing the Enclosure 164...
Page 182: ...Appendix A Technical Information Specifications 168...
Page 196: ...Index 182...