7 Commissioning
7.1 General
Danger
Commissioning may only be carried out by an approved installer.
The installer checks the tightness of pipes, the correct function of
all regulating, control and safety equipment, and measures the
combustion values. If this work is not carried out correctly, there is
a risk of considerable damage to persons, environment and prop
erty.
7.2 Checklist for commissioning
Tab.8
Checklist for commissioning
1.
System location
2.
Customer
3.
Boiler type/Designa
tion
4.
Serial number
5.
Characteristic gas val
ues
Wobbe index
kWh/m³
..........................
6.
Operating heating value
kWh/m³
..........................
7.
Have all pipelines and connections been checked for tightness?
□
8.
Exhaust gas system checked?
□
9.
Gas pipeline checked and vented?
□
10. Static pressure measured at the gas valve inlet?
mbar ...............................
11. Free wheeling of pumps checked?
□
12. Filling the heating plant
□
13. Used water additives
...............................
14. Gas flow pressure measured at full load at the gas valve inlet?
mbar ...............................
15. Gas injector pressure measured at full load at the gas valve outlet?
mbar ...............................
16. CO
2
-content at low load
% ...............................
17. CO-content at low load
ppm ...............................
18. CO
2
-content at full load
% ...............................
19. CO-content at full load
ppm ...............................
20.
Function test:
Heating mode
□
21.
Domestic water mode
□
22.
Programming:
Time /date
□
23.
Comfort setpoint heating circuit 1/2
°C ...............................
24.
Setpoint DHW
°C ...............................
25.
Automatic day time programme
Clock ...............................
26.
Heating curve checked?
□
27. Tightness of the flue system checked in operation (e.g. CO
2
test in annular gap)?
28. Customer instructed?
□
29. Documents handed over?
□
7 Commissioning
7636047 - 02 - 24082015
51
Summary of Contents for eurocondense four 125 kw
Page 19: ...3 2 6 Wiring diagram Fig 3 Wiring diagram 3 Technical specifications 7636047 02 24082015 19 ...
Page 40: ...Fig 22 Legend for application examples part 2 5 Before installation 40 7636047 02 24082015 ...
Page 143: ...13 Appendix 13 1 Declaration of conformity 13 Appendix 7636047 02 24082015 143 ...
Page 146: ...Index 146 7636047 02 24082015 ...
Page 148: ...7636047 02 24082015 ...