
Caution
Keep the installation room frost-free.
If an antifreeze agent is used, pipework, radiators and gas con
densing boilers are protected against frost damage. For the gas
condensing boiler to be ready for operation at any time, suitable
measures must also be taken to keep the installation room frost-
free. If applicable, please also note special measures for any in
stalled domestic hot water calorifiers.
The table shows the relevant amounts of heat transfer medium and water
that need to be mixed together for varying volumes of water. If other frost
protection temperatures are required in exceptional cases, individual cal
culations can be made on the basis of this table.
Water content of
the system
[l]
Amount
Lasacor® LS 1
[l]
Water in the mix
ture
(1)
[l]
Frost protec
tion down to
[°C]
50
36
14
-15
100
71
29
-15
150
107
43
-15
200
143
57
-15
250
178
72
-15
300
214
86
-15
500
357
143
-15
1000
714
286
-15
(1) The water for the mixture must be neutral (potable water quality with no
more than 100 mg/kg chlorine) or demineralised. Please also follow the
manufacturer instructions.
5.2.7 Water hardness tips
1. With reference to the specific system volume (e.g. when using heating
water buffer storage tanks), determine which requirements apply re
garding total hardness of the fill and top-up water to VDI directive
2035 and the following table.
If partial softening to 6°dH is insufficient according to the project-spe
cific water hardness diagram, use either an additive or use only fully
desalinated water (with pH stabiliser).
If a boiler is replaced in an existing system, we recommend installing a
dirt trap or filter in the system return, upstream of the boiler. Flush the
system thoroughly.
2. Depending on the materials used, determine whether the addition of
inhibitors, partial softening or full desalination is the best method.
3. Record the filling process (If an additive is used, note this on the boil
er). To prevent gas pockets and bubbles, it is essential to fully vent
the system at maximum operating temperature.
4. After 8 to 12 weeks, check and record the pH value. Offer and con
clude a maintenance contract.
5. Once a year, check the system is operating correctly with regard to
pressure maintenance, pH value and the volume of top-up water
used.
Tab.6
Table to VDI 2035 Sheet 1
Total heating output
in kW
Total hardness in °dH
subject to the specific system volume
< 20 l/kW
≥ 20 l/kW and
< 50l/kW
≥ 50 l/kW
< 50
(1)
≤ 16.8
≤ 11.2
< 0.11
50 - 200
≤ 11.2
≤ 8.4
< 0.11
200 - 600
≤ 8.4
≤ 0.11
< 0.11
5 Before installation
7636047 - 02 - 24082015
27
Summary of Contents for eurocondense four 125 kw
Page 19: ...3 2 6 Wiring diagram Fig 3 Wiring diagram 3 Technical specifications 7636047 02 24082015 19 ...
Page 40: ...Fig 22 Legend for application examples part 2 5 Before installation 40 7636047 02 24082015 ...
Page 143: ...13 Appendix 13 1 Declaration of conformity 13 Appendix 7636047 02 24082015 143 ...
Page 146: ...Index 146 7636047 02 24082015 ...
Page 148: ...7636047 02 24082015 ...