6.1.2 Installing the air supply duct at the side
The installation of the air supply duct on the left-hand side of the boiler is
shown below.
1. Remove the lower rear wall
2. Remove the side cover plate
3. Insert the intake pipe elbow onto the existing intake pipe and turn in
to the side position
4. Replace the lower rear wall
6.1.3 Installing the air supply duct at the rear
The installation of the air supply duct on the rear of the boiler is shown be
low.
1. Remove the lower rear wall
2. Remove the rear cover plate
3. Insert the intake pipe extension onto the existing intake pipe
4. Mount the lower rear wall
2
RA-0000360
1
3
RA-0000361
1
3
2
6 Installation
42
7636047 - 02 - 24082015
Summary of Contents for eurocondense four 125 kw
Page 19: ...3 2 6 Wiring diagram Fig 3 Wiring diagram 3 Technical specifications 7636047 02 24082015 19 ...
Page 40: ...Fig 22 Legend for application examples part 2 5 Before installation 40 7636047 02 24082015 ...
Page 143: ...13 Appendix 13 1 Declaration of conformity 13 Appendix 7636047 02 24082015 143 ...
Page 146: ...Index 146 7636047 02 24082015 ...
Page 148: ...7636047 02 24082015 ...