
6 Installation
6.1 Mounting
6.1.1 Converting the exhaust connection
The conversion of the top passage to the side or rear passage of the flue
gas connection is shown below.
1. Remove the lower rear wall.
2. Remove the flue gas connection leading upward and insert an 87°
elbow
3. Turn 87° elbow to the desired position (side or towards the rear)
4. Remove either the rear cover plate or the side cover plate
5. Replace the lower rear wall
6. Glue the upper cover plate in place
RA-0000359
3
2
1
4
4
6
6 Installation
7636047 - 02 - 24082015
41
Summary of Contents for eurocondense four 125 kw
Page 19: ...3 2 6 Wiring diagram Fig 3 Wiring diagram 3 Technical specifications 7636047 02 24082015 19 ...
Page 40: ...Fig 22 Legend for application examples part 2 5 Before installation 40 7636047 02 24082015 ...
Page 143: ...13 Appendix 13 1 Declaration of conformity 13 Appendix 7636047 02 24082015 143 ...
Page 146: ...Index 146 7636047 02 24082015 ...
Page 148: ...7636047 02 24082015 ...