24
Safety Practices
Handling Cylinders
Review the following precautions to ensure the safe use and handling of gas
cylinders.
•
If it becomes necessary to move cylinders, do so with a suitable hand truck
after insuring that the container cap is secured and the cylinder is properly
fastened to the hand truck.
•
Use only regulators, tubing and hose connectors approved by an appropriate
regulatory agency.
•
Arrange gas hoses where they will not be damaged or stepped on and where
objects will not be dropped on them.
•
Do
not
refill cylinders.
•
Check the condition of pipes, hoses and connectors regularly. Perform gas leak
tests at all joints and seals of the gas system regularly, using an approved gas
leak detection system.
•
When the equipment is turned off, close all gas cylinder valves tightly at the
cylinder. Bleed the remainder of the line before turning the exhaust vent off.
Safety Practices for Flame Atomization
Safety Interlocks
PerkinElmer provides a number of safety interlocks on the burner system to
monitor gas pressure and check for the proper setup of the burner head, nebulizer,
and drain system. In addition a flame sensor checks that the flame is burning.
•
Do
not
attempt to defeat these interlocks; you may compromise your own,
or someone else's, safety.
Safe Use of Burner Gases
The seepage of fuel gas or fuel gas mixture from the burner system, the drain
system, the gas control system, or the gas connections constitutes a serious fire
hazard.
•
Make sure that there are no breaks or leaks in any of these systems and that
all the seals are correctly installed and in good condition.
Summary of Contents for PINAACLE 900 Series
Page 1: ...PINAACLE 900 SERIES Customer Hardware and Service Guide ATOMIC SPECTROSCOPY...
Page 2: ......
Page 3: ...PinAAcle 900 Series Customer Hardware and Service Guide...
Page 52: ...36 Safety Practices...
Page 55: ...39 Lab Space Requirements Dimensions and Weights Figure 2 1 Instrument dimenstions...
Page 84: ...68 Preparing Your Laboratory...
Page 91: ...75 The PinAAcle 900 Series Spectrometer System Figure 3 2 Optical System for the PinAAcle 900H...
Page 92: ...76 System Description Figure 3 3 Optical System for the PinAAcle 900T...
Page 93: ...77 The PinAAcle 900 Series Spectrometer System Figure 3 4 Optical System for the PinAAcle 900Z...
Page 101: ...85 Burner Assembly System Figure 3 8 Block diagram of the burner system...
Page 210: ...194 Preparing the System...
Page 310: ...294 Maintenance Figure 6 54 Window key Item Description 1 Window key 1...
Page 354: ...338 Maintenance...
Page 388: ...I 6 Index W WEEE Instructions 34 Weights 39 Windows cleaning 321 refitting 320 removing 318...
Page 389: ......