![PerkinElmer PINAACLE 900 Series Customer Hardware And Service Manual Download Page 199](http://html1.mh-extra.com/html/perkinelmer/pinaacle-900-series/pinaacle-900-series_customer-hardware-and-service-manual_1530227199.webp)
183
Setting up the System for Analyses Using the Furnace Technique For the
Figure 5-2.
Furnace cover in the locked furnace analysis position
Setting up the Analysis
Switching on the System on page 165
2. If you need to change techniques from flame technique to the furnace
technique go into WinLab32 for AA and select
File > Change Technique >
furnace
.
Item
Description
1
Furnace cover in locked up position for furnace analysis
1
Summary of Contents for PINAACLE 900 Series
Page 1: ...PINAACLE 900 SERIES Customer Hardware and Service Guide ATOMIC SPECTROSCOPY...
Page 2: ......
Page 3: ...PinAAcle 900 Series Customer Hardware and Service Guide...
Page 52: ...36 Safety Practices...
Page 55: ...39 Lab Space Requirements Dimensions and Weights Figure 2 1 Instrument dimenstions...
Page 84: ...68 Preparing Your Laboratory...
Page 91: ...75 The PinAAcle 900 Series Spectrometer System Figure 3 2 Optical System for the PinAAcle 900H...
Page 92: ...76 System Description Figure 3 3 Optical System for the PinAAcle 900T...
Page 93: ...77 The PinAAcle 900 Series Spectrometer System Figure 3 4 Optical System for the PinAAcle 900Z...
Page 101: ...85 Burner Assembly System Figure 3 8 Block diagram of the burner system...
Page 210: ...194 Preparing the System...
Page 310: ...294 Maintenance Figure 6 54 Window key Item Description 1 Window key 1...
Page 354: ...338 Maintenance...
Page 388: ...I 6 Index W WEEE Instructions 34 Weights 39 Windows cleaning 321 refitting 320 removing 318...
Page 389: ......