![PerkinElmer PINAACLE 900 Series Customer Hardware And Service Manual Download Page 202](http://html1.mh-extra.com/html/perkinelmer/pinaacle-900-series/pinaacle-900-series_customer-hardware-and-service-manual_1530227202.webp)
186
Preparing the System
4. Move In/Place the auto-sample. Lock the auto-sampler in position with the
knobs.
Aligning the Graphite Furnace
The graphite furnace must be correctly aligned in the radiation beam. Once you
have aligned the furnace, it remains aligned during routine operation. Nevertheless,
always check alignment of the furnace:
•
If you change from a graphite tube without an integrated platform to a
graphite tube with an integrated platform check the alignment.
Refer to following figure for the alignment controls.
Warning: High Temperatures – Risk of Burns
The graphite furnace can generate very high temperatures. Do
not
touch
any parts of the furnace, especially the graphite components, until they
have cooled to room temperature.
Warning: High Temperatures UV Radiation – Risk of Burns and
Eye
Damage
The graphite furnace can generate very high temperatures, and can emit
UV radiation which can damage your eyes, when it is heated to
incandescence.
The furnace is exposed when it is in the standby position, thus increasing
these risks..
Never heat the furnace when it is in the standby position. Always
move it into the atomizer compartment before you heat it.
!
Warning
!
Warning
Summary of Contents for PINAACLE 900 Series
Page 1: ...PINAACLE 900 SERIES Customer Hardware and Service Guide ATOMIC SPECTROSCOPY...
Page 2: ......
Page 3: ...PinAAcle 900 Series Customer Hardware and Service Guide...
Page 52: ...36 Safety Practices...
Page 55: ...39 Lab Space Requirements Dimensions and Weights Figure 2 1 Instrument dimenstions...
Page 84: ...68 Preparing Your Laboratory...
Page 91: ...75 The PinAAcle 900 Series Spectrometer System Figure 3 2 Optical System for the PinAAcle 900H...
Page 92: ...76 System Description Figure 3 3 Optical System for the PinAAcle 900T...
Page 93: ...77 The PinAAcle 900 Series Spectrometer System Figure 3 4 Optical System for the PinAAcle 900Z...
Page 101: ...85 Burner Assembly System Figure 3 8 Block diagram of the burner system...
Page 210: ...194 Preparing the System...
Page 310: ...294 Maintenance Figure 6 54 Window key Item Description 1 Window key 1...
Page 354: ...338 Maintenance...
Page 388: ...I 6 Index W WEEE Instructions 34 Weights 39 Windows cleaning 321 refitting 320 removing 318...
Page 389: ......