106
Installation
Carefully lift the spectrometer onto a movable table to transport it to the new
location.
For instructions on reinstallation see
Reinstalling the Spectrometer on page 107
Furnace Shipping Position
1. Open the flame door.
2. For PinAAcle 900T and 900Z, make sure that the furnace knob is securely
tightened all the way so that the furnace head will not move if the spectrometer
must be relocated.
Caution
The spectrometer is a precision optical instrument. Move the spectrometer
very carefully and protect it from vibrations and jolts. Do not tilt the
spectrometer.
If the spectrometer must be tilted or mechanically lifted, contact your
PerkinElmer service representative before moving the spectrometer. The
shipping locks must be properly secured to prevent any damage occurring
if the spectrometer is tilted or jolted.
Summary of Contents for PINAACLE 900 Series
Page 1: ...PINAACLE 900 SERIES Customer Hardware and Service Guide ATOMIC SPECTROSCOPY...
Page 2: ......
Page 3: ...PinAAcle 900 Series Customer Hardware and Service Guide...
Page 52: ...36 Safety Practices...
Page 55: ...39 Lab Space Requirements Dimensions and Weights Figure 2 1 Instrument dimenstions...
Page 84: ...68 Preparing Your Laboratory...
Page 91: ...75 The PinAAcle 900 Series Spectrometer System Figure 3 2 Optical System for the PinAAcle 900H...
Page 92: ...76 System Description Figure 3 3 Optical System for the PinAAcle 900T...
Page 93: ...77 The PinAAcle 900 Series Spectrometer System Figure 3 4 Optical System for the PinAAcle 900Z...
Page 101: ...85 Burner Assembly System Figure 3 8 Block diagram of the burner system...
Page 210: ...194 Preparing the System...
Page 310: ...294 Maintenance Figure 6 54 Window key Item Description 1 Window key 1...
Page 354: ...338 Maintenance...
Page 388: ...I 6 Index W WEEE Instructions 34 Weights 39 Windows cleaning 321 refitting 320 removing 318...
Page 389: ......