196
Maintenance
General Maintenance Checklist
The following checklist describes general maintenance procedures.
•
For safety reasons, and to avoid contaminating new samples, you should
ensure that the work area is kept absolutely clean. This is especially
important when working with toxic substances and when measuring trace
amounts of any elements.
•
Clean up spills immediately, using a spill clean-up kit approved by your
organization.
Note
Decontamination
If the instrument or an accessory requires decontamination before
repair, maintenance, warranty or trade-in purposes at PerkinElmer, the
responsible body should read the procedure and complete the certificate which is
available on the PerkinElmer public website:
http://las.perkinelmer.com/OneSource/decontamination.htm
Follow the “Decontamination of Instrumentation and Associated Sub-
assemblies” procedure and complete the “Certificate of Decontamination.” The
certificate is used to certify the decontamination process was completed before
equipment can be returned to PerkinElmer.
Note
This equipment requires no specified inspection or preventive
maintenance to ensure the continuous functioning of its safety features.
In accordance with safe laboratory practices, spilled material should be
cleaned up and disposed of properly, taking into consideration the
following:
location and size of the spill;
chemical and physical properties of the material;
hazardous properties of the material; and
types of personal protective equipment that might be needed.
!
Warning
Summary of Contents for PINAACLE 900 Series
Page 1: ...PINAACLE 900 SERIES Customer Hardware and Service Guide ATOMIC SPECTROSCOPY...
Page 2: ......
Page 3: ...PinAAcle 900 Series Customer Hardware and Service Guide...
Page 52: ...36 Safety Practices...
Page 55: ...39 Lab Space Requirements Dimensions and Weights Figure 2 1 Instrument dimenstions...
Page 84: ...68 Preparing Your Laboratory...
Page 91: ...75 The PinAAcle 900 Series Spectrometer System Figure 3 2 Optical System for the PinAAcle 900H...
Page 92: ...76 System Description Figure 3 3 Optical System for the PinAAcle 900T...
Page 93: ...77 The PinAAcle 900 Series Spectrometer System Figure 3 4 Optical System for the PinAAcle 900Z...
Page 101: ...85 Burner Assembly System Figure 3 8 Block diagram of the burner system...
Page 210: ...194 Preparing the System...
Page 310: ...294 Maintenance Figure 6 54 Window key Item Description 1 Window key 1...
Page 354: ...338 Maintenance...
Page 388: ...I 6 Index W WEEE Instructions 34 Weights 39 Windows cleaning 321 refitting 320 removing 318...
Page 389: ......