20
Safety Practices
The HGA graphite furnace can generate temperatures of up to 2700 °C.
•
Do
not
touch any part of the graphite furnace until it has cooled to room
temperature.
•
Do
not
attempt to inject a sample into the graphite tube when the furnace is hot.
You may be subjected to fumes from the sudden vaporization of the sample,
and may damage the pipette.
Quartz Tube Atomizer Cell
The quartz tube atomizer cell (QTA-cell) used for the hydride-generation
technique (option) can reach temperatures of up to 1000 °C.
•
Do
not
touch any part of the heating mantle (electrically heated systems), or
the cell holder (flame-heated systems), or the QTA-cell until they have cooled
to room temperature.
Handling Compressed Gases
Note
The responsible body must ensure that the type of connector used at the
outlet side of the gas-pressure regulator conforms to applicable national
requirements.
Note
The responsible body is responsible for the correct collection and disposal
of waste materials. This includes the necessity for a suitably sized waste
container of appropriately resistant material for the collection of organic
solvent waste and provision for the removal into an appropriate exhaust
system of any gases or vapors which may be produced in hazardous
concentrations.
Note
The responsible body must carry out appropriate leakage tests necessary
for safety on those gas and liquid connections which the operator is
directed to assemble during installation, normal use, or maintenance.
Summary of Contents for PINAACLE 900 Series
Page 1: ...PINAACLE 900 SERIES Customer Hardware and Service Guide ATOMIC SPECTROSCOPY...
Page 2: ......
Page 3: ...PinAAcle 900 Series Customer Hardware and Service Guide...
Page 52: ...36 Safety Practices...
Page 55: ...39 Lab Space Requirements Dimensions and Weights Figure 2 1 Instrument dimenstions...
Page 84: ...68 Preparing Your Laboratory...
Page 91: ...75 The PinAAcle 900 Series Spectrometer System Figure 3 2 Optical System for the PinAAcle 900H...
Page 92: ...76 System Description Figure 3 3 Optical System for the PinAAcle 900T...
Page 93: ...77 The PinAAcle 900 Series Spectrometer System Figure 3 4 Optical System for the PinAAcle 900Z...
Page 101: ...85 Burner Assembly System Figure 3 8 Block diagram of the burner system...
Page 210: ...194 Preparing the System...
Page 310: ...294 Maintenance Figure 6 54 Window key Item Description 1 Window key 1...
Page 354: ...338 Maintenance...
Page 388: ...I 6 Index W WEEE Instructions 34 Weights 39 Windows cleaning 321 refitting 320 removing 318...
Page 389: ......