308
Maintenance
2. Disconnect the normal gas tube from the inlet manifold on the power
unit:
Carefully push the black locking ring of the connector into the connector
and pull the tube out of the connector. This releases the gas pressure.
3. Pull the right-hand furnace block by hand to the side.
The graphite tube is now accessible.
4. Remove the graphite tube.
Do
not
touch the graphite tube with bare fingers.
6. Very carefully, using a small screwdriver, lever the graphite shield ring from
the left-hand contact.
Figure 6-61.
Contact change
To remove the right-hand contact:
1. Take the contact installation tool provided and slide the dome-shaped extractor
onto the bolt. Pass the bolt from the internal side of the furnace through the
Item
Description
1
Graphite shield ring
1
Summary of Contents for PINAACLE 900 Series
Page 1: ...PINAACLE 900 SERIES Customer Hardware and Service Guide ATOMIC SPECTROSCOPY...
Page 2: ......
Page 3: ...PinAAcle 900 Series Customer Hardware and Service Guide...
Page 52: ...36 Safety Practices...
Page 55: ...39 Lab Space Requirements Dimensions and Weights Figure 2 1 Instrument dimenstions...
Page 84: ...68 Preparing Your Laboratory...
Page 91: ...75 The PinAAcle 900 Series Spectrometer System Figure 3 2 Optical System for the PinAAcle 900H...
Page 92: ...76 System Description Figure 3 3 Optical System for the PinAAcle 900T...
Page 93: ...77 The PinAAcle 900 Series Spectrometer System Figure 3 4 Optical System for the PinAAcle 900Z...
Page 101: ...85 Burner Assembly System Figure 3 8 Block diagram of the burner system...
Page 210: ...194 Preparing the System...
Page 310: ...294 Maintenance Figure 6 54 Window key Item Description 1 Window key 1...
Page 354: ...338 Maintenance...
Page 388: ...I 6 Index W WEEE Instructions 34 Weights 39 Windows cleaning 321 refitting 320 removing 318...
Page 389: ......