![PerkinElmer PINAACLE 900 Series Customer Hardware And Service Manual Download Page 119](http://html1.mh-extra.com/html/perkinelmer/pinaacle-900-series/pinaacle-900-series_customer-hardware-and-service-manual_1530227119.webp)
103
Before You Install the Spectrometer
8. Along the underside of the instrument are hidden handles. Locate these handles
and position two people on each where these handles are located.
9. Squat down and place both hands underneath the instrument handles. Spread
your hands as far apart as possible while grasping the underside of the
instrument.
10. With knees bent, simultaneously lift the instrument up as you end up in a
standing position. Carefully place the instrument on the bench.
11. Remove any adhesive tape on instrument.
Recycling the Instrument Box
If the customer plans on moving your PinAAcle Series Spectrometer they may
want to keep the cardboard box that the instrument was shipped in. If the customer
needs to dispose of the cardboard box please have them do so in accordance with
their local environmental regulations
Before You Install the Spectrometer
When the spectrometer arrives
•
Check the exterior of the shipping crate for obvious signs of damage. If the
crate has been damaged, file a claim with the authorized carrier immediately
and inform your nearest PerkinElmer office.
•
Contact your local PerkinElmer office to arrange for the installation.
Before the service engineer arrives
•
You must prepare a suitable site for the spectrometer and any accessories. See
Chapter 2,
Preparing Your Laboratory on page 37
and the guides for any
accessories.
•
You must make sure that the fume ventilation system and the necessary gas
supply lines and regulators are installed.
Summary of Contents for PINAACLE 900 Series
Page 1: ...PINAACLE 900 SERIES Customer Hardware and Service Guide ATOMIC SPECTROSCOPY...
Page 2: ......
Page 3: ...PinAAcle 900 Series Customer Hardware and Service Guide...
Page 52: ...36 Safety Practices...
Page 55: ...39 Lab Space Requirements Dimensions and Weights Figure 2 1 Instrument dimenstions...
Page 84: ...68 Preparing Your Laboratory...
Page 91: ...75 The PinAAcle 900 Series Spectrometer System Figure 3 2 Optical System for the PinAAcle 900H...
Page 92: ...76 System Description Figure 3 3 Optical System for the PinAAcle 900T...
Page 93: ...77 The PinAAcle 900 Series Spectrometer System Figure 3 4 Optical System for the PinAAcle 900Z...
Page 101: ...85 Burner Assembly System Figure 3 8 Block diagram of the burner system...
Page 210: ...194 Preparing the System...
Page 310: ...294 Maintenance Figure 6 54 Window key Item Description 1 Window key 1...
Page 354: ...338 Maintenance...
Page 388: ...I 6 Index W WEEE Instructions 34 Weights 39 Windows cleaning 321 refitting 320 removing 318...
Page 389: ......