108
Installation
Install the spectrometer by following exactly the procedures described in this
chapter, as summarized in the steps below.
1. Prepare the new site for the spectrometer; see Chapter 2,
.
2. Connect the burner and furnace gas supplies.
3. Connect the drain system to the burner.
4. Install the furnace autosampler.
5. Connect the cooling system for the graphite furnace.
6. Make sure that the main power switches of all the instruments are in the off
position, then connect the electrical cables.
Connecting the Burner Gases
The connectors for the burner gases are located on the rear panel of the
spectrometer.
What you need to provide
•
Suitable supplies of acetylene, air, and nitrous oxide. The gases must conform
with the requirements listed in Chapter 2,
Preparing Your Laboratory on page
.
•
Suitable pressure regulators and on/off valves near to the spectrometer for the
gas supplies.
The gas supply systems must comply with your local safety regulations. Also refer
to the information given under
.
Note
The instrument ships with the nebulizer in place based on the part number
configuration ordered (a stainless steel or high sensitivity corrosion
resistant plastic nebulizer).
Summary of Contents for PINAACLE 900 Series
Page 1: ...PINAACLE 900 SERIES Customer Hardware and Service Guide ATOMIC SPECTROSCOPY...
Page 2: ......
Page 3: ...PinAAcle 900 Series Customer Hardware and Service Guide...
Page 52: ...36 Safety Practices...
Page 55: ...39 Lab Space Requirements Dimensions and Weights Figure 2 1 Instrument dimenstions...
Page 84: ...68 Preparing Your Laboratory...
Page 91: ...75 The PinAAcle 900 Series Spectrometer System Figure 3 2 Optical System for the PinAAcle 900H...
Page 92: ...76 System Description Figure 3 3 Optical System for the PinAAcle 900T...
Page 93: ...77 The PinAAcle 900 Series Spectrometer System Figure 3 4 Optical System for the PinAAcle 900Z...
Page 101: ...85 Burner Assembly System Figure 3 8 Block diagram of the burner system...
Page 210: ...194 Preparing the System...
Page 310: ...294 Maintenance Figure 6 54 Window key Item Description 1 Window key 1...
Page 354: ...338 Maintenance...
Page 388: ...I 6 Index W WEEE Instructions 34 Weights 39 Windows cleaning 321 refitting 320 removing 318...
Page 389: ......