231
Nebulizer Removal and Reinstallation
Removing the Stainless Steel Nebulizer
Remove the nebulizer using the following procedure:
1. Open up the Sample Introduction Compartment door to the burner chamber.
2. Pull out the nebulizer locking clamp back and carefully but firmly, rotate the
stainless steel side arm upwards 90 degrees to the unlock position.
Figure 6-19.
Stainless steel nebulizer
Item
Description
Item
Description
1
Nebulizer in locked position
4
Nebulizer stainless steel arm in up
position
2
Nebulizer stainless steel arm
in locked position
5
Nebulizer Interlock sensor
3
Nebulizer in unlock position
1
2
3
4
5
Summary of Contents for PINAACLE 900 Series
Page 1: ...PINAACLE 900 SERIES Customer Hardware and Service Guide ATOMIC SPECTROSCOPY...
Page 2: ......
Page 3: ...PinAAcle 900 Series Customer Hardware and Service Guide...
Page 52: ...36 Safety Practices...
Page 55: ...39 Lab Space Requirements Dimensions and Weights Figure 2 1 Instrument dimenstions...
Page 84: ...68 Preparing Your Laboratory...
Page 91: ...75 The PinAAcle 900 Series Spectrometer System Figure 3 2 Optical System for the PinAAcle 900H...
Page 92: ...76 System Description Figure 3 3 Optical System for the PinAAcle 900T...
Page 93: ...77 The PinAAcle 900 Series Spectrometer System Figure 3 4 Optical System for the PinAAcle 900Z...
Page 101: ...85 Burner Assembly System Figure 3 8 Block diagram of the burner system...
Page 210: ...194 Preparing the System...
Page 310: ...294 Maintenance Figure 6 54 Window key Item Description 1 Window key 1...
Page 354: ...338 Maintenance...
Page 388: ...I 6 Index W WEEE Instructions 34 Weights 39 Windows cleaning 321 refitting 320 removing 318...
Page 389: ......