![PerkinElmer PINAACLE 900 Series Customer Hardware And Service Manual Download Page 203](http://html1.mh-extra.com/html/perkinelmer/pinaacle-900-series/pinaacle-900-series_customer-hardware-and-service-manual_1530227203.webp)
187
Setting up the System for Analyses Using the Furnace Technique For the
Figure 5-4.
Alignment controls on the furnace
1. Check that a lamp for the element you intend to determine is installed in the
spectrometer and properly aligned.
2. Where applicable, switch off the deuterium lamp background corrector.
Item
Description
1
Vertical (up-down) alignment control
2
Horizontal (forward-backward) alignment control
3
Locking lever (locks horizontal movement of the furnace)
4
Move lever left to unlock
5
Move lever right to lock
1
2
3
4
5
Summary of Contents for PINAACLE 900 Series
Page 1: ...PINAACLE 900 SERIES Customer Hardware and Service Guide ATOMIC SPECTROSCOPY...
Page 2: ......
Page 3: ...PinAAcle 900 Series Customer Hardware and Service Guide...
Page 52: ...36 Safety Practices...
Page 55: ...39 Lab Space Requirements Dimensions and Weights Figure 2 1 Instrument dimenstions...
Page 84: ...68 Preparing Your Laboratory...
Page 91: ...75 The PinAAcle 900 Series Spectrometer System Figure 3 2 Optical System for the PinAAcle 900H...
Page 92: ...76 System Description Figure 3 3 Optical System for the PinAAcle 900T...
Page 93: ...77 The PinAAcle 900 Series Spectrometer System Figure 3 4 Optical System for the PinAAcle 900Z...
Page 101: ...85 Burner Assembly System Figure 3 8 Block diagram of the burner system...
Page 210: ...194 Preparing the System...
Page 310: ...294 Maintenance Figure 6 54 Window key Item Description 1 Window key 1...
Page 354: ...338 Maintenance...
Page 388: ...I 6 Index W WEEE Instructions 34 Weights 39 Windows cleaning 321 refitting 320 removing 318...
Page 389: ......