29
Installation Manual
The Lithium-ion storage battery system is a rechargeable product and is therefore classified as an electrical instrument.
Be extremely careful and wire it safely.
by qualified personnel.
5. Electrical Connection of System and Battery
5-1. Electrical Connection of Battery
● Do not allow water to enter the inside of the main body. Please pay special attention while it is raining or snowing.
● Do not perform work when the scaffolding and/or your hands are wet.
● Do not touch or short-circuit the POWER electrodes.
● Always wear insulating gloves and insulated shoes while doing wiring.
If the battery electrolytes are leaking, do not touch the liquid with your bare hands.
● Discharge static electricity before working with the wires.
● The work must be performed
● Check that the battery connector is plugged in securely.
● Make sure that the battery is wired correctly.
● Check that the DC protector is OFF before wiring the batteries.
● Do not remove the connector cover until the wiring is started.
①
Battery Wiring
1) DC protector OFF check
Make sure that the DC protector is OFF before connecting the battery connector.
DC Protector
Handle
OFF
(DC protector)
Summary of Contents for LJ-NA02
Page 6: ...Installation Manual Installation ...
Page 49: ...Installation Manual Setup ...
Page 100: ...Installation Manual ...