97
Installation Manual
by qualified personnel.
properly configured.
9. Checking the Network Adaptor Connections
9-1. Checking the Network Adaptor Connections
In order to connect this system to the server via the Network Adaptor to perform remote controls, etc., the
communications with the Network Adaptor must be operating normally. Otherwise, the remote control instructions, etc.
from the server cannot be accepted.
● The DR control instructions, etc. from the server cannot be accepted if the communications with the Network
Adaptor are not
● The work must be performed
9-2. Starting Up the Network Adaptor
■
Preparation
•
Switch the DC Protector (
) and protection device for the storage battery system to ON.
(
)
■
Operation Procedure
•
Switch ON the protection device for Network Adaptor.(
)
The Network Adaptor launches and starts communicating with the storage battery system.
CT
CT
L
N1
N
L1
COM
COM
PE
PE
PE
Switch board
N
L
PE
N
Stand-alone
Socket-outlet
(Type-02)
Turn off these protection
devices in an emergency.
Network
Adaptor
Main
switch
Point of
Supply
TN or TT
system
Storage
battery
system
DC Protector
DC Protector
SB
SB
2
SB
1
SB
1
DRED
SYS
Protection
device for
Storage
battery
system
Protection
device for
Network
Adaptor
Summary of Contents for LJ-NA02
Page 6: ...Installation Manual Installation ...
Page 49: ...Installation Manual Setup ...
Page 100: ...Installation Manual ...