Remove the Server From the Rack
Preparing for Service
63
Remove the Server From the Rack
Caution -
The server weighs approximately 63 pounds (28.5 kg). Two people are required to
unmount and carry the chassis.
1.
Disconnect all the cables and power cords from the server.
2.
Remove the cable management arm (CMA).
For instructions for removing the CMA, see the
“Remove the Cable Management Arm” in
“Oracle Server X5-2L Installation Guide ”
.
3.
Extend the server to the maintenance position.
See
“Extend the Server to the Maintenance Position” on page 61
.
4.
From the front of the server, pull the green slide-rail release tabs toward the front
of the server, and pull the server out of the rack until it is free of the rack rails [1
and 2].
A slide-rail release tab is located on each slide-rail.
FIGURE 8
Removing the Server From the Chassis
5.
Set the server on a sturdy work surface.
Related Information
■
“Disconnect Cables From the Server” on page 60
■
“Extend the Server to the Maintenance Position” on page 61
■
“Reinstall the Server in the Rack” on page 230
Summary of Contents for X5-2L
Page 1: ...Part No E48333 04 May 2015 Oracle Server X5 2L Service Manual ...
Page 2: ......
Page 12: ...12 Oracle Server X5 2L Service Manual May 2015 ...
Page 24: ...24 Oracle Server X5 2L Service Manual May 2015 ...
Page 50: ...50 Oracle Server X5 2L Service Manual May 2015 ...
Page 70: ...70 Oracle Server X5 2L Service Manual May 2015 ...
Page 100: ...100 Oracle Server X5 2L Service Manual May 2015 ...
Page 268: ...268 Oracle Server X5 2L Service Manual May 2015 ...
Page 292: ...292 Oracle Server X5 2L Service Manual May 2015 ...