Preparing the Site
This section describes the steps you should take to prepare the site for your system.
■
“Cautions and Considerations” on page 95
■
“Reviewing System Specifications” on page 96
■
“Reviewing Power Requirements” on page 99
■
“Preparing for Cooling” on page 106
■
“Preparing the Unloading Route and Unpacking Area” on page 111
■
“Preparing the Network” on page 113
Cautions and Considerations
Consider the following when selecting a location for the new rack.
■
Do not install the rack in a location that is exposed to:
■
Direct sunlight
■
Excessive dust
■
Corrosive gases
■
Air with high salt concentrations
■
Frequent vibrations
■
Sources of strong radio frequency interference
■
Static electricity
■
Use power outlets that provide proper grounding.
■
A qualified electrical engineer must perform any grounding work.
■
Each grounding wire for the rack must be used only for the rack.
■
The grounding resistance must not be greater than 10 ohms.
■
Verify the grounding method for the building.
■
Observe the precautions, warnings, and notes about handling that appear on labels on the
equipment.
Preparing the Site
95
Summary of Contents for SuperCluster T5-8
Page 1: ...Oracle SuperCluster T5 8 Owner s Guide Part No E40167 17 May 2016 ...
Page 2: ......
Page 11: ...Contents Index 353 11 ...
Page 12: ...12 Oracle SuperCluster T5 8 Owner s Guide May 2016 ...
Page 14: ...14 Oracle SuperCluster T5 8 Owner s Guide May 2016 ...
Page 116: ...116 Oracle SuperCluster T5 8 Owner s Guide May 2016 ...
Page 204: ...204 Oracle SuperCluster T5 8 Owner s Guide May 2016 ...
Page 228: ...228 Oracle SuperCluster T5 8 Owner s Guide May 2016 ...
Page 244: ...244 Oracle SuperCluster T5 8 Owner s Guide May 2016 ...