![Oracle SuperCluster T5-8 Owner'S Manual Download Page 343](http://html1.mh-extra.com/html/oracle/supercluster-t5-8/supercluster-t5-8_owners-manual_1646175343.webp)
Connecting an Expansion Rack to Oracle SuperCluster T5-8
Leaf Switch
Connection
Cable Length
R5 IB3 to Rack 4
R5-IB3-P11B to R4-IB1-P10A
5 meters
R5 IB3 to Rack 6
R5-IB3-P8B to R6-IB1-P4A
5 meters
R5 IB3 to Rack 7
R5-IB3-P9A to R7-IB1-P5A
5 meters
R5 IB3 to Rack 8
R5-IB3-P9B to R8-IB1-P6A
10 meters
R5 IB2 within Rack 5
R5-IB2-P8A to R5-IB1-P3B
3 meters
R5 IB2 to Rack 1
R5-IB2-P10A to R1-IB1-P7B
10 meters
R5 IB2 to Rack 2
R5-IB2-P10B to R2-IB1-P8B
10 meters
R5 IB2 to Rack 3
R5-IB2-P11A to R3-IB1-P9B
5 meters
R5 IB2 to Rack 4
R5-IB2-P11B to R4-IB1-P10B
5 meters
R5 IB2 to Rack 6
R5-IB2-P8B to R6-IB1-P4B
5 meters
R5 IB2 to Rack 7
R5-IB2-P9A to R7-IB1-P5B
5 meters
R5 IB2 to Rack 8
R5-IB2-P9B to R8-IB1-P6B
10 meters
The following table shows the cable connections for the sixth spine switch (R6-IB1) when
cabling eight full racks together.
TABLE 119
Leaf Switch Connections for the Sixth Rack in an Eight-Rack System
Leaf Switch
Connection
Cable Length
R6 IB3 within Rack 6
R6-IB3-P8A to R6-IB1-P3A
3 meters
R6 IB3 to Rack 1
R6-IB3-P9B to R1-IB1-P6A
10 meters
R6 IB3 to Rack 2
R6-IB3-P10A to R2-IB1-P7A
10 meters
R6 IB3 to Rack 3
R6-IB3-P10B to R3-IB1-P8A
5 meters
R6 IB3 to Rack 4
R6-IB3-P11A to R4-IB1-P9A
5 meters
R6 IB3 to Rack 5
R6-IB3-P11B to R5-IB1-P10A
5 meters
R6 IB3 to Rack 7
R6-IB3-P8B to R7-IB1-P4A
5 meters
R6 IB3 to Rack 8
R6-IB3-P9A to R8-IB1-P5A
5 meters
R6 IB2 within Rack 6
R6-IB2-P8A to R6-IB1-P3B
3 meters
R6 IB2 to Rack 1
R6-IB2-P9B to R1-IB1-P6B
10 meters
R6 IB2 to Rack 2
R6-IB2-P10A to R2-IB1-P7B
10 meters
R6 IB2 to Rack 3
R6-IB2-P10B to R3-IB1-P8B
5 meters
R6 IB2 to Rack 4
R6-IB2-P11A to R4-IB1-P9B
5 meters
R6 IB2 to Rack 5
R6-IB2-P11B to R5-IB1-P10B
5 meters
R6 IB2 to Rack 7
R6-IB2-P8B to R7-IB1-P4B
5 meters
R6 IB2 to Rack 8
R6-IB2-P9A to R8-IB1-P5B
5 meters
The following table shows the cable connections for the seventh spine switch (R7-IB1) when
cabling eight full racks together.
Connecting Expansion Racks
343
Summary of Contents for SuperCluster T5-8
Page 1: ...Oracle SuperCluster T5 8 Owner s Guide Part No E40167 17 May 2016 ...
Page 2: ......
Page 11: ...Contents Index 353 11 ...
Page 12: ...12 Oracle SuperCluster T5 8 Owner s Guide May 2016 ...
Page 14: ...14 Oracle SuperCluster T5 8 Owner s Guide May 2016 ...
Page 116: ...116 Oracle SuperCluster T5 8 Owner s Guide May 2016 ...
Page 204: ...204 Oracle SuperCluster T5 8 Owner s Guide May 2016 ...
Page 228: ...228 Oracle SuperCluster T5 8 Owner s Guide May 2016 ...
Page 244: ...244 Oracle SuperCluster T5 8 Owner s Guide May 2016 ...