Move Oracle SuperCluster T5-8
■
“Install a Ground Cable (Optional)” on page 124
■
“Adjust the Leveling Feet” on page 125
Move Oracle SuperCluster T5-8
1.
Plan a route to the installation site.
See
“Access Route Guidelines” on page 112
2.
Ensure that the system doors are closed and secured.
3.
Ensure that all four leveling feet on the rack are raised and out of the way.
Caution -
Use at least two people to move the rack: one person in front and one person in back
to help guide the rack. Move the rack slowly at 0.65 meters per second (approximately two feet
per second) or slower.
4.
Push the system from behind to the installation site.
Note -
The front casters do not swivel; you must steer the cabinet by turning the rear casters.
Caution -
Never push on the side panels to move the rack. Pushing on the side panels can tip
the rack over.
122
Oracle SuperCluster T5-8 Owner's Guide • May 2016
Summary of Contents for SuperCluster T5-8
Page 1: ...Oracle SuperCluster T5 8 Owner s Guide Part No E40167 17 May 2016 ...
Page 2: ......
Page 11: ...Contents Index 353 11 ...
Page 12: ...12 Oracle SuperCluster T5 8 Owner s Guide May 2016 ...
Page 14: ...14 Oracle SuperCluster T5 8 Owner s Guide May 2016 ...
Page 116: ...116 Oracle SuperCluster T5 8 Owner s Guide May 2016 ...
Page 204: ...204 Oracle SuperCluster T5 8 Owner s Guide May 2016 ...
Page 228: ...228 Oracle SuperCluster T5 8 Owner s Guide May 2016 ...
Page 244: ...244 Oracle SuperCluster T5 8 Owner s Guide May 2016 ...