Three-Rack Cabling
The following table shows the cable connections for the second spine switch (R2-U1) when
cabling three racks together.
TABLE 25
Leaf Switch Connections for the Second Rack in a Three-Rack System
Leaf Switch
Connection
Cable Length
R2-U32 within Rack 2
R2-U32-P8A to R2-U1-P3A
R2-U32-P8B to R2-U1-P4A
R2-U32-P9A to R2-U1-P5A
5 meters
R2-U32 to Rack 1
R2-U32-P11A to R1-U1-P9A
R2-U32-P11B to R1-U1-P10A
5 meters
R2-U32 to Rack 3
R2-U32-P9B to R3-U1-P6A
R2-U32-P10A to R3-U1-P7A
R2-U32-P10B to R3-U1-P8A
5 meters
R2-U26 within Rack 2
R2-U26-P8A to R2-U1-P3B
R2-U26-P8B to R2-U1-P4B
R2-U26-P9A to R2-U1-P5B
5 meters
R2-U26 to Rack 1
R2-U26-P11A to R1-U1-P9B
R2-U26-P11B to R1-U1-P10B
5 meters
R2-U26 to Rack 3
R2-U26-P9B to R3-U1-P6B
R2-U26-P10A to R3-U1-P7B
R2-U26-P10B to R3-U1-P8B
5 meters
The following table shows the cable connections for the third spine switch (R3-U1) when
cabling three full racks together.
TABLE 26
Leaf Switch Connections for the Third Rack in a Three-Rack System
Leaf Switch
Connection
Cable Length
R3-U32 within Rack 3
R3-U32-P8A to R3-U1-P3A
R3-U32-P8B to R3-U1-P4A
R3-U32-P9A to R3-U1-P5A
5 meters
R3-U32 to Rack 1
R3-U32-P9B to R1-U1-P6A
R3-U32-P10A to R1-U1-P7A
R3-U32-P10B to R1-U1-P8A
5 meters
R3-U32 to Rack 2
R3-U32-P11A to R2-U1-P9A
5 meters
266
Oracle SuperCluster T5-8 Owner's Guide • May 2016
Summary of Contents for SuperCluster T5-8
Page 1: ...Oracle SuperCluster T5 8 Owner s Guide Part No E40167 17 May 2016 ...
Page 2: ......
Page 11: ...Contents Index 353 11 ...
Page 12: ...12 Oracle SuperCluster T5 8 Owner s Guide May 2016 ...
Page 14: ...14 Oracle SuperCluster T5 8 Owner s Guide May 2016 ...
Page 116: ...116 Oracle SuperCluster T5 8 Owner s Guide May 2016 ...
Page 204: ...204 Oracle SuperCluster T5 8 Owner s Guide May 2016 ...
Page 228: ...228 Oracle SuperCluster T5 8 Owner s Guide May 2016 ...
Page 244: ...244 Oracle SuperCluster T5 8 Owner s Guide May 2016 ...