![background image](http://html.mh-extra.com/html/omron/zx-t/zx-t_operation-manual_1633402039.webp)
36
S
ect
io
n
2
C
o
nfir
ming W
a
rm
-up Comple
tion
ZX-T
Operation Manual
Section 2
PREPARATIONS FOR MEASUREMENT
Confirming Warm-up Completion
When the power is turned ON in RUN or T Mode, the sub-display will flash
W-UP
to show that
the Sensor is warming up. Warm-up requires approximately 1 to 15 minutes. When warming
up has been completed, the normal display will be shown.
Measurement operations can be performed while in warm-up display status, but the precision of
measurements before warming up has been completed will be low. For high-precision measure-
ments, wait until warming up has been completed.
SUB
Summary of Contents for ZX-T -
Page 1: ...OPERATION MANUAL Smart Sensors ZX T Series Cat No E346 E1 04 ...
Page 9: ...6 Preface Contents ZX T Operation Manual PREFACE ...
Page 15: ...12 Preface How to Use This Manual ZX T Operation Manual PREFACE ...
Page 16: ...Section 1 FEATURES 13 ZX T Operation Manual Section 1 FEATURES ZX T Features 14 ...
Page 53: ...50 Section 3 Function Transition Charts ZX T Operation Manual Section 3 BASIC OPERATION ...
Page 103: ...100 Section 5 Error Output Function ZX T Operation Manual Section 5 DETAILED SETTINGS ...
Page 113: ...110 Section 6 Initializing Settings Data ZX T Operation Manual Section 6 AUXILIARY FUNCTIONS ...