29
ZX-T
Operation Manual
S
ect
io
n
2
In
s
ta
lling Se
ns
or
He
a
d
s
Section 2
PREPARATIONS FOR MEASUREMENT
Preamplifiers
■
Installation
Use the enclosed Preamplifier Mounting Bracket.
The Preamplifier can also be mounted to 35-mm DIN Track.
Use the ZX-XBT2 Preamplifier DIN Track Mounting Bracket (order separately) when mounting
the Preamplifier to DIN Track.
1.
Use M3 screws to fix the enclosed Preampli-
fier mounting bracket.
2.
Snap one end of the Preamplifier into the
bracket.
3.
Then snap the other end of the Preamplifier
into the bracket.
■
Removal Method
Hold the center of the Preamplifier and lift.
27
±
0.1
Two, M3
(Units: mm)
Mounting dimensions diagram
3
2
Summary of Contents for ZX-T -
Page 1: ...OPERATION MANUAL Smart Sensors ZX T Series Cat No E346 E1 04 ...
Page 9: ...6 Preface Contents ZX T Operation Manual PREFACE ...
Page 15: ...12 Preface How to Use This Manual ZX T Operation Manual PREFACE ...
Page 16: ...Section 1 FEATURES 13 ZX T Operation Manual Section 1 FEATURES ZX T Features 14 ...
Page 53: ...50 Section 3 Function Transition Charts ZX T Operation Manual Section 3 BASIC OPERATION ...
Page 103: ...100 Section 5 Error Output Function ZX T Operation Manual Section 5 DETAILED SETTINGS ...
Page 113: ...110 Section 6 Initializing Settings Data ZX T Operation Manual Section 6 AUXILIARY FUNCTIONS ...