![background image](http://html1.mh-extra.com/html/omron/ns15-v2-series/ns15-v2-series_setup-manual_743134063.webp)
3-2 Starting the PT
3-9
3-2 Starting the PT
Check that the hardware is connected properly, turn ON the power to the PT, and then start
the PT.
Use the following procedure to start the PT.
3-2-1
Operation at Startup
When the power is ON or the PT is reset, the PT will operate as follows:
Indicator lights orange.
Immediately after the power is turned ON, the indicator will light orange.
The file system will be checked and the system recovered if the power was turned OFF while
a file was being written in previous operation, or if the battery capacity was low and drive
safety information from the system program area screen data area could not be saved.
↓
Indicator lights green.
When the system starts properly, the indicator will light green.
If the indicator does not light green, the system programs may be damaged. Contact your
nearest OMRON representative.
↓
Startup message is displayed.
A message about the startup status will be displayed.
If an error occurs, the PT will stop startup procedures and display a message. (Refer to
Sec-
tion 5 Troubleshooting
in the
Programming Manual
.)
If an error occurs that allows startup to continue, a warning will be displayed. When a warning
is displayed, the PT will enter standby state and wait for touch input. Check the message and
then touch the screen. The PT will continue with startup procedures.
Summary of Contents for NS15-V2 Series
Page 1: ...Cat No V083 E1 14 Programmable Terminals NS Series SETUP MANUAL...
Page 2: ......
Page 34: ...1 4 Procedure for Running NS series PTs 1 12...
Page 54: ...2 2 Part Names and Functions 2 20...
Page 144: ...4 4 Recommended Connector Cables 4 28...
Page 174: ...5 3 Connecting to Host via EtherNet IP 5 30...
Page 246: ...6 11 Verifying Tags 6 72...
Page 280: ...Appendix 2 Dimensions A 20 NS5 V1 V2 Cable Connection Dimensions...
Page 333: ......
Page 334: ......