![background image](http://html1.mh-extra.com/html/omron/ns15-v2-series/ns15-v2-series_setup-manual_743134066.webp)
3-2 Starting the PT
3-12
Example: Input March 15, 2002 as
2002.3.15
.
e) Press the time display area under the heading
Calendar Check
. A dialog box will be displayed. In-
put the time using a 24-hour clock in hours/minutes/seconds format.
Example:
Input
06:01:01 p.m. as
18.1.1
.
The
Write
Button will be displayed, but the time and date settings will be enabled immediately after
they have been input in the dialog box.
This completes the procedure required to start the PT for the first time. Now transfer the project
data. Refer to
3-6 Using Memory Cards
and
Transferring Data to the PT
in the CX-Designer’s
Online Help.
Summary of Contents for NS15-V2 Series
Page 1: ...Cat No V083 E1 14 Programmable Terminals NS Series SETUP MANUAL...
Page 2: ......
Page 34: ...1 4 Procedure for Running NS series PTs 1 12...
Page 54: ...2 2 Part Names and Functions 2 20...
Page 144: ...4 4 Recommended Connector Cables 4 28...
Page 174: ...5 3 Connecting to Host via EtherNet IP 5 30...
Page 246: ...6 11 Verifying Tags 6 72...
Page 280: ...Appendix 2 Dimensions A 20 NS5 V1 V2 Cable Connection Dimensions...
Page 333: ......
Page 334: ......