3-8 Installing the Controller Link Interface Unit
3-48
z
Connecting and Disconnecting
1. Mount the Connector Conversion Board onto the back of the PT so that its expansion in-
terface connector is inserted into the expansion interface connector on the back of the
PT and the respective screw holes are aligned. Hold the Board by the corners keeping it
parallel to back of the PT.
PT’s expansion
interface connector
Connector Conversion
Board
Connector Conversion Board’s
expansion interface connector
Hold the four corners and insert straight
to the expansion interface connector on
the PT.
Align the positions of the holes
2. Secure the four corners of the Connector Conversion Board with screws.
Summary of Contents for NS15-V2 Series
Page 1: ...Cat No V083 E1 14 Programmable Terminals NS Series SETUP MANUAL...
Page 2: ......
Page 34: ...1 4 Procedure for Running NS series PTs 1 12...
Page 54: ...2 2 Part Names and Functions 2 20...
Page 144: ...4 4 Recommended Connector Cables 4 28...
Page 174: ...5 3 Connecting to Host via EtherNet IP 5 30...
Page 246: ...6 11 Verifying Tags 6 72...
Page 280: ...Appendix 2 Dimensions A 20 NS5 V1 V2 Cable Connection Dimensions...
Page 333: ......
Page 334: ......