![background image](http://html1.mh-extra.com/html/omron/ns15-v2-series/ns15-v2-series_setup-manual_743134129.webp)
4-2 1:N Host Connection
4-13
Setting the Front Panel Switches
•
Using RS-232C
Set DIP switch pin 4 or 5 of the CPU Unit according to the port to which the PT is connected,
as shown below. (The following figure shows a CJ1G CPU Unit. The arrangement depends
on the CPU Unit, but the DIP switch settings are the same.)
DIP switch (inside battery compartment)
Turn ON pin 4 when connecting the PT to the
peripheral port (to use the communications
settings in the PLC Setup).
Turn ON pin 5 when connecting the PT to the
RS-232C port (to use the communications
settings in the PLC Setup).
Peripheral port
Connected to a Programming Console or other
device.
RS-232C port
Connected to a Programming Console or
other device.
Summary of Contents for NS15-V2 Series
Page 1: ...Cat No V083 E1 14 Programmable Terminals NS Series SETUP MANUAL...
Page 2: ......
Page 34: ...1 4 Procedure for Running NS series PTs 1 12...
Page 54: ...2 2 Part Names and Functions 2 20...
Page 144: ...4 4 Recommended Connector Cables 4 28...
Page 174: ...5 3 Connecting to Host via EtherNet IP 5 30...
Page 246: ...6 11 Verifying Tags 6 72...
Page 280: ...Appendix 2 Dimensions A 20 NS5 V1 V2 Cable Connection Dimensions...
Page 333: ......
Page 334: ......