in this folder. When create a folder, if a folder with same project
name has existed, prompt of “This project has existed already, cover
it or not?” will pop up; select Yes button to cover it, if select No,
input box for project name will pop up and require inputting new
project name.
2) Select tested project
Press
T
button behind pull-down list box of Site to list all tested
projects, select one to save its pile data files in this project.
2. New pile
If need to test a new pile, press New Pile behind Foundation pile
name and input the name of new pile in the pop-up soft keyboard.
When read the file of tested pile or test a certain pile, the name of this
pile will display at here and it cannot be changed.
3. Number of pipes
Press edit box behind the Number of pipes to pop up
single-choice box of number of pipes. The optional value is 2, 3 and 4.
This value is set according to the number of built-in pipes in piles to
be tested. When selected pipe, corresponding schematic graph of pipe
will display on the top right corner of dialogue box for parameter
setting based on the setting of pipe. Meanwhile, the spacing and
profile status of pipe will change accordingly based on the setting of
pipe.