![background image](http://html.mh-extra.com/html/nec/express5800-340hb-r-n8800-047f/express5800-340hb-r-n8800-047f_user-manual_251247212.webp)
5-54 Installing and Using Utilities
Procedure in the ft server utility
Perform the procedure below before replacement of a component.
1.
Select the target component by using the ft server utility.
2.
Check the current state of the target component with the LEDs and event log.
3.
Click the [Clear] button in [MTBF Clear] of the target component.
The MTBF clearing result can be confirmed by the LEDs on the target component. The
result of the MTBF clearing operation is registered in the event log.
4.
Start the component.
Sample screen of ft server utility
[PCI Module]
Summary of Contents for Express5800/340Hb-R N8800-047F
Page 1: ...N8800 047F 073F NEC Express5800 340Hb R User s Guide 1st Edition 3 2005 856 125126 901 A ...
Page 14: ...viii This page is intentionally left blank ...
Page 17: ...Precautions for Use 1 3 Label A Label B Label C Label D ...
Page 20: ...1 6 Precautions for Use Label A Label B Label C ...
Page 22: ...1 8 Precautions for Use Label A Label B Label C ...
Page 51: ...General Description 2 15 Chassis Board Layout Clock board Interface board Back panel ...
Page 76: ...2 40 General Description This page is intentionally left blank ...
Page 90: ...3 14 Windows Setup and Operation 7 Configure the mirror of the extended volume ...
Page 124: ...3 48 Windows Setup and Operation This page is intentionally left blank ...
Page 158: ...4 34 System Configuration This page is intentionally left blank ...
Page 171: ...Installing and Using Utilities 5 13 ...
Page 244: ...6 12 Maintenance This page is intentionally left blank ...
Page 278: ...7 34 Troubleshooting This page is intentionally left blank ...
Page 306: ...8 28 Option This page is intentionally left blank ...
Page 312: ...B 4 IRQ and I O Port Address This page is intentionally left blank ...