
Installation
Installing the IntraMail PCB
IntraMail for Aspire System Guide
Chapter 1: Quick Setup
◆
7
1
Powering Up and Checking the LEDs
Step 1
Power up the system.
- Remove the grounded wrist strap.
- Turn the cabinet power switch to
On
.
Step 2
Check the CPU LEDs
(Figure 7: Checking the CPU LEDs)
- Wait about 10 seconds, then verify the CPU LEDs.
- Make sure that
LD2
is the only LED
fl
ashing on the CPU.
(LD2
fl
ashes green 1/2 second on and 1/2 second off.)
Figure 7: Checking the CPU LEDs
0893100-164
LD2
LD4
LD3
LD1