Installation and ATP Order
– continued
DEC 2000
1-33
SC
t
300 BTS Hardware Installation, ATP and FRU Procedures
PRELIMINARY
14. Test cable calibration.
15. Create CAL file.
16. RF path audit.
17. TX and RX Acceptance tests.
18. Generate an ATP Report.
19. Copy LMF CAL file to CBSC.
20. Terminate LMF session/leave the site.
Frequency Hopping Pilot
Beacon ATP Order
The Frequency Hopping Pilot Beacon (FHPB) ATP for the MicroCell
and PicoCell units is performed in the following sequence:
1. Create CAL file.
2. RF path audit.
3. TX Acceptance tests.
4. Generate an ATP Report.
5. Copy LMF CAL file to CBSC.
6. Terminate LMF session/leave the site.
1