Power, Ground, and Battery Cabling for Sites Equipped With
Customer–Supplied Site I/O Interface
– continued
PRELIMINARY
SC
t
300 BTS Hardware Installation, ATP and FRU Procedures
DEC 2000
4-20
Figure 4-11: AC Installation Box
1
3
2
AC POWER CABLE
CONNECTOR
GREEN
WHITE
BLACK
TO GROUND
CONNECTOR ON INSIDE
OF DOOR
NOTE: Shown with door removed for clarity
1–IN AC
CONDUIT
TO MICROCELL/
PICOCELL LOCATION
GROUND
NEUTRAL
LINE
CUSTOMER
AC INPUT
Table 4-21: Procedure to Install DC Input Cable(s)
Step
Action
1
Connect the loose wires of cable U (DC input cable) to the
customer defined DC power source. Refer to NO TAG for
wiring information.
2
Verify all connections of cable U with an multimeter prior to
routing the cable.
3
Route cable U from the DC power supply to the unit location.
4