Site Cabling for BTS With Optional Primary Surge Suppressor
PRELIMINARY
SC
t
300 BTS Hardware Installation, ATP and FRU Procedures
DEC 2000
5-2
Preparing Site Cabling Scope
of Work
Figure 5-1 through Figure 5-8 shows the scope of work to be performed
for preparing the site cabling with the optional Primary Surge
Suppressor. Chapter 6 shows the scope of work for unit cabling.
Figure 5-1: Site Cabling for One Microcell with Primary Surge Suppressor
MICROCELL 1
CUSTOMER
INPUTS
SPAN
RGPS
PHONE
(MODEM)
ANT A
RX
DC POWER
KEY
B/1(ANTENNA)
LABEL
NUMBER
OF CABLES
NAME
A/1(GROUND)
U/1(DC POWER)
SITE I/O
CABLE
P/1 (SU)
M/1 (RGPS)
N/1 (SPAN)
O/1 (CUSTOMER
INPUTS)
V/1 (PHONE)
AC POWER
T/1(AC POWER)
C/1 (ANTENNA)
PRIMARY
SURGE
SUPPRESSOR
D/1
(ANTENNA)
S/1 (AC
POWER)
MASTER
GROUND
Y/1 (MASTER
GROUND)
D/1
(ANTENNA)
ANT B
TX/RX
C/1 (ANTENNA)
B/1 (GROUND)
SITE I/O
INTERFACE
5