Site Cabling for BTS With Customer–Supplied Site I/O Interface
– continued
DEC 2000
4-9
SC
t
300 BTS Hardware Installation, ATP and FRU Procedures
PRELIMINARY
Figure 4-2: Site Cabling for Two Microcells
MICROCELL 1
CUSTOMER
INPUTS
SPAN
RGPS
SITE I/O
INTERFACE
PHONE
(MODEM)
LA
LA
DSU
LA
MICROCELL 2
ANT 2
TX/RX
LA
DC POWER
GROUND
ANT 1
TX/RX
LA
DC POWER
GROUND
KEY
B/1(ANTENNA)
LABEL
NUMBER
OF CABLES
NAME
Y/1(GROUND)
Y/1(GROUND)
D/1(ANTENNA)
D/1(ANTENNA)
U/1(DC POWER)
U/1(DC POWER)
LEGEND
LA
= Lightning Arrestor
NOTES
1: Site I/O junction box and associated cable are
present on Microcell 1 only.
2. If BTS is not equipped with the primary surge
suppressor, then you will require the Site I/O Cable
Extender Cable, p/n 3088116C01 (cable Z).
3. The AC Installation Box is required for outdoor
applications.
E/1 (MIB) OR
K/1 (MIB)
Q/1 (SU)
P/1 (SU)
M/1 (RGPS)
N/1 (SPAN)
O/1 (CUSTOMER
INPUT)
V/1 (PHONE)
Z/1 (SITE I/O
CABLE) SEE
NOTES 1
AND 2
B/1 (GROUND)
AC POWER
LA
S/1(AC POWER)
AC INSTALL
BOX
(SEE NOTE 3)
AC POWER
LA
S/1(AC POWER)
AC INSTALL
BOX
(SEE NOTE 3)
4