RGPS Cabling for Multi–BTS Configurations
– continued
PRELIMINARY
SC
t
300 BTS Hardware Installation, ATP and FRU Procedures
DEC 2000
4-32
Cable Diagram
Figure 4-16 and Figure 4-17 both show the cabling for multi–unit
configurations for both RGPS (sychronous) and HSO
(non–synchronous).
Procedure
Connect the cables (Cable O) between the RGPS head (if used) and the
site I/O junction box of each BTS. Refer to the cable run list in
Table 4-30, Figure 4-16 and Figure 4-17.
4