Dimensions and Clearances
– continued
PRELIMINARY
SC
t
300 BTS Hardware Installation, ATP and FRU Procedures
DEC 2000
2-12
Unit Clearances
The unit clearances are shown below.
Figure 2-4: Installation and Functional Clearances for MicroCell Units (with Solar Covers)
50 mm air exhaust area
50 mm air intake area
100 mm clearance for installation handles
200 mm clearance for tool access
600 mm from front of unit for FRU installation and removal
MICROCELL WITH SOLAR COVERS
0 mm Functional Clearance in Front of Microcell With Solar Cover
2