List of Tables
– continued
PRELIMINARY
SC
t
300 BTS Hardware Installation, ATP and FRU Procedures
DEC 2000
xii
Table 4-7: Microcell/Picocell Expansion Kit for Units 2 to 3
Long 5m MIB B – T448AS
4-5
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Table 4-8: Microcell/Picocell Expansion Kit for Units 3 to 4
Current 2m MIBs B and C – T448AT
4-5
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Table 4-9: Microcell/Picocell Expansion Kit for Units 3 to 4
Longer 5M MIBs B and C – T448AU
4-6
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Table 4-10: Picocell Expansion Kit for Units 3 to 4
Current 2M MIBs B and C – T448AV
4-6
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Table 4-11: Picocell Expansion Kit for Units 3 to 4
Longer 5M MIBs B and C – T448AW
4-6
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Table 4-12: RGPS Synchronization Cable Kit – SGKN4351A
4-7
. . . . . . . . . . . .
Table 4-13: RGPS Synchronization Cable Kit – SGKN4352A
4-7
. . . . . . . . . . . .
Table 4-14: Cables Needed for Power, Earth Ground, and Battery Connections
4-17
Table 4-15: AC Input Cable Information
4-17
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Table 4-16: DC Input Cable Information
4-18
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Table 4-17: Procedure to Install Earth Ground Cable
4-18
. . . . . . . . . . . . . . . . . . . . .
Table 4-18: Procedure to Install AC Input Cable(s) (Indoor Applications)
4-19
. . . .
Table 4-19: Procedure to Install AC Installation Box
(Optional – Required for Outdoor Installations)
4-19
. . . . . . . . . . . . . . . . . . . . . . . .
Table 4-20: AC Installation Box Cabling
4-19
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Table 4-21: Procedure to Install DC Input Cable(s)
4-20
. . . . . . . . . . . . . . . . . . . . . .
Table 4-24: Cables Needed for Antenna Connections
4-21
. . . . . . . . . . . . . . . . . . . .
Table 4-25: Pin and Signal Information for Cable C (Antenna Cable)
4-21
. . . . . . .
Table 4-26: Cables Needed for Antenna Connections
4-24
. . . . . . . . . . . . . . . . . . . .
Table 4-27: Pin/Signal Information for Site I/O Cable
4-26
. . . . . . . . . . . . . . . . . . . .
Table 4-28: Connecting the RGPS to the Site I/O Cable
4-29
. . . . . . . . . . . . . . . . . .
Table 4-29: Cable Descriptions and Part Numbers
4-31
. . . . . . . . . . . . . . . . . . . . . . .
Table 4-30: RGPS Synchronization Cable Kit – SGKN4351A
4-31
. . . . . . . . . . . .
Table 4-31: RGPS Synchronization Cable Kit – SGKN4352A
4-31
. . . . . . . . . . . .
Table 4-32: Multi–BTS Cable Run List
4-35
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Table 4-31: Cable Descriptions and Part Numbers
4-36
. . . . . . . . . . . . . . . . . . . . . . .
Table 4-32: Cable Run List for Span Line Daisy Chain Cabling
4-38
. . . . . . . . . . . .
Table 5-1: Procedure to Attach the Surge Suppressor to the Mounting Bracket
5-10
Table 5-2: Cables Needed for Power, Earth Ground, and Battery Connections
5-13
.
Table 5-3: AC Input Cable Information
5-13
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Table 5-4: DC Input Cable Information
5-14
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Table 5-5: Procedure to Install the Master Ground Cable on a
BTS Equipped with Optional Primary Surge Suppressor
5-14
. . . . . . . . . . . . . . . . .
Table 5-6: Procedure to Install Earth Ground Cable on a
BTS Equipped with Optional Primary Surge Suppressor
5-15
. . . . . . . . . . . . . . . . .