300 BTS Hardware Installation, ATP and FRU Procedures
PRELIMINARY
Table 6-47: Procedure to Power on the Surge Suppressor, the Unit, and
Mount the Solar Cover
6-53
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Table 6-47: Installation Completion Checklist
6-58
. . . . . . . . . . . . . . . . . . . . . . . . . .
Table 7-1: Procedure for Removing Diagnostic Access Cover
7-5
. . . . . . . . . . . . .
Table 7-2: 15–Pin MMI/LMF Serial Cable Information
7-8
. . . . . . . . . . . . . . . . . .
Table 7-3: Interfacing test equipment to the BTS
7-9
. . . . . . . . . . . . . . . . . . . . . . . .
Table 7-4: Connect the Communication Test Set and Power Meter to the LMF
7-13
Table 7-5: Create a HyperTerminal Connection
7-15
. . . . . . . . . . . . . . . . . . . . . . . . .
Table 7-6: Establishing MMI Communication
7-17
. . . . . . . . . . . . . . . . . . . . . . . . . .
Table 7-7: Updating Default Channel Setting to Customer Operating Channel
7-18
Table 7-8: Verify BTS Sync Mode
7-20
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Table 7-9: Verify DPLL Tracking
7-20
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Table 7-10: Verify Default Startup Coordinates
7-22
. . . . . . . . . . . . . . . . . . . . . . . . .
Table 7-11: Create Site–Specific BTS Directory
7-24
. . . . . . . . . . . . . . . . . . . . . . . .
Table 7-12: Start the LMF and Login to the BTS
7-25
. . . . . . . . . . . . . . . . . . . . . . .
Table 7-13: Update BTS Specific CDF File Device Load Version
7-26
. . . . . . . . . .
Table 7-14: Download/Enable MAWI
7-27
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Table 7-15: System Status LED States
7-28
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Table 7-16: Selecting Test Equipment Manually in a Serial Connection Tab
7-30
. .
Table 7-17: Selecting Test Equipment Using Auto-Detect
7-31
. . . . . . . . . . . . . . . . .
Table 7-18: Test Equipment Calibration
7-32
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Table 7-19: R3465 Calibration Procedure
7-33
. . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Table 7-20: Gigatronics Power Meter GPIB Address Procedure
7-35
. . . . . . . . . . . .
Table 7-21: Test Equipment Setup
7-36
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Table 7-22: Test Equipment Selection
7-37
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Table 7-23: Calibrate the Power Meter
7-38
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Table 7-24: Automated Cable Calibration
7-40
. . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Table 7-25: Create CAL File
7-43
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Table 7-26: RF Path Audit
7-45
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Table 7-27: 1900 MHz TX and RX Frequency vs. Channel
7-49
. . . . . . . . . . . . . . .
Table 7-28: 800 MHz TX and RX Frequency vs. Channel
7-51
. . . . . . . . . . . . . . . .
Table 7-29: TX Acceptance Test Outline
7-53
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Table 7-30: TX Test Using Backup Synchronization
7-53
. . . . . . . . . . . . . . . . . . . . .
Table 7-31: RX ATP Test
7-55
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Table 7-32: Generate an ATP Report
7-60
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Table 7-33: Copy Files from LMF to a Diskette
7-61
. . . . . . . . . . . . . . . . . . . . . . . .
Table 7-34: Copying CAL Files from Diskette to the CBSC
7-62
. . . . . . . . . . . . . . .