Required Documents
DEC 2000
1-11
SC
t
300 BTS Hardware Installation, ATP and FRU Procedures
PRELIMINARY
Required Documents
The following documents are required to perform the installation, ATP
and FRU procedures of the cell site equipment:
S
SC
t
300 BTS Hardware Installation, ATP and FRU – 68P09224A55
(This manual)
S
Site Document (generated by Motorola Systems Engineering), which
includes:
– site specific documentation
– channel allocation
– contact list (customer)
– ancillary/expendable equipment list
– site wiring lists
– contact list (Motorola support)
– job box inventory
S
Demarcation Document (Scope of Work agreement)
S
Grounding Guidelines for Cellular Radio Installations
(Motorola part number 68P81150E62)
S
CDMA LMF Operator’s Guide; 68P64114A78.
S
Installation manuals for non-Motorola equipment (for reference
purposes).
1