6
- 22
6.3 Preparatory Procedure and Setting
6
PREPARATORY PROCEDURES AND SETTING
(b) GX Works2/GX Developer and SW3PVC-CCPU
When performing troubleshooting according to the CC-Link IE controller network
module manual, actions to be taken with GX Works2/GX Developer are as
follows.
Table 6.4 GX Works2/GX Developer and SW3PVC-CCPU
GX Works2/GX Developer
SW3PVC-CCPU
CC IE Control Network Diagnostics
Use the CC-Link IE Controller Network diagnostics result
screen of CC IE Control utility.
PLC diagnostics
Use the System information screen of C Controller setting
utility.
Error code check
Check the Module information tab or System information
screen of C Controller setting utility for error.
Sequence program check
Check the user program for error.
Device test
Use Device monitoring utility.
Device batch monitor
Use Device monitoring utility.
Network parameter
Use the Parameter settings tab of CC IE Control utility.
Network range assignment
Use the Network range assignment screen of CC IE Control
utility.
H/W test
Use the Parameter settings screen of CC IE Control utility.
Refresh parameters
Use the Refresh parameter settings screen of CC IE Control
utility.
Link start/stop
Use the Link start/stop screen of CC IE Control utility.
Routing parameters
Use the Routing parameter settings screen of CC IE Control
utility.
Circuit test
Use the Parameter settings screen of CC IE Control utility.
Test between station
Use the Parameter settings screen of CC IE Control utility.
Communication test
Use the Communication test screen of CC IE Control utility.
Self-loopback test
Use the Parameter settings screen of CC IE Control utility.
Summary of Contents for Q06CCPU-V
Page 2: ......
Page 612: ...APPX 48 Appendix 11 Functions Added by Version Upgrade APPENDICES Memo ...
Page 617: ......