4 Connection
MITSUBISHI CNC
110
4.2.5.3 Connecting with MDS-DJ Series
<
Connection
>
CN1A:CN1B connector on NC or previous stage's drive unit
CN1B:CN1A connector on next stage's drive unit
CAUTION
1. Connect the NC and the drive units by the optical communication cables. The distance between the NC and the
final drive unit must be within 30m and the bending radius within 80mm.
2. A spindle drive unit that controls the high-speed synchronous tapping (OMR-DD control) has to be connected
on the farther side from the NC than the subject synchronous control.
POINT
Axis Nos. are determined by the rotary switch for setting the axis No. (Refer to the instruction manual of drive
unit.) The axis No. has no relation to the order for connecting to the NC.
The optical communication cables from the NC to the
final drive unit must be within 30m.
Optical
communication
cable
Connected
to the NC
MDS-DJ-V1
1st axis
MDS-DJ-V1
2nd axis
MDS-DJ-SP
4th axis
MDS-DJ-V1
3rd axis
Summary of Contents for M70V Series
Page 1: ......
Page 13: ......
Page 15: ......
Page 17: ......
Page 19: ......
Page 21: ......
Page 25: ......
Page 26: ...1 1 System Configuration ...
Page 36: ...11 2 General Specifications ...
Page 110: ...85 3 Installation ...
Page 120: ...95 4 Connection ...
Page 173: ...4 Connection MITSUBISHI CNC 148 ...
Page 174: ...149 付録 Ap 1 章 149 Appendix 1 Cable ...
Page 220: ...195 付録 Ap 2 章 195 Appendix 2 EMC Installation Guidelines ...
Page 232: ...207 付録 Ap 3 章 207 Appendix 3 Restrictions for Lithium Batteries ...
Page 241: ...Appendix 3 Restrictions for Lithium Batteries MITSUBISHI CNC 216 ...
Page 242: ...217 付録 Ap 4 章 217 Appendix 4 Precautions for Compliance to UL c UL Standards ...
Page 246: ......
Page 250: ......