3 Installation
MITSUBISHI CNC
90
3.2.2 Shield Clamping of Cables
The shield cables connected to the units must be properly connected to the ground with clamp fittings and the like in
order to stabilize the system's operation while preventing malfunctioning due to exogenous noise. (Refer to "EMC
Installation Guidelines: EMC Countermeasure Parts: Shield Clamp Fitting".)
3.2.3 Connecting Spark Killers
Connect a spark killer on the coil or the contact in parallel for noise countermeasures.
Use spark killers which are 0.33 to 0.1
μ
F, 10 to 120
Ω
.
E
Contact
Spark
killer
Coil
Spark
killer
Summary of Contents for M70V Series
Page 1: ......
Page 13: ......
Page 15: ......
Page 17: ......
Page 19: ......
Page 21: ......
Page 25: ......
Page 26: ...1 1 System Configuration ...
Page 36: ...11 2 General Specifications ...
Page 110: ...85 3 Installation ...
Page 120: ...95 4 Connection ...
Page 173: ...4 Connection MITSUBISHI CNC 148 ...
Page 174: ...149 付録 Ap 1 章 149 Appendix 1 Cable ...
Page 220: ...195 付録 Ap 2 章 195 Appendix 2 EMC Installation Guidelines ...
Page 232: ...207 付録 Ap 3 章 207 Appendix 3 Restrictions for Lithium Batteries ...
Page 241: ...Appendix 3 Restrictions for Lithium Batteries MITSUBISHI CNC 216 ...
Page 242: ...217 付録 Ap 4 章 217 Appendix 4 Precautions for Compliance to UL c UL Standards ...
Page 246: ......
Page 250: ......